303-714-4840
303-714-4800

30,000tpd Tungsten-Molybdenum Concentrator NI 43-101

Canada
Project Highlights
  • SE was the primary engineer for the NI 43-101 Technical Report
  • Conventional open pit mine with tungsten and molybdenum concentrate products
  • Ammonia paratungstate (APT) plant for further tungsten concentrate processing
Services
  • Feasibility Level Engineering – Process, piping/mechanical, civil/structural, electrical, instrumentation and controls
  • Metallurgical Testwork Program Support
  • Project Economics
  • Project Management and Project Controls
Unit Operations
  • Crushing
  • Material Handling
  • Grinding
  • Flotation
  • Concentrate Dewatering by Filtration
  • Digestion and Residue Filtration
  • Alkali Recovery and Solution Purification
  • APT Crystallization
  • Plant Water Treatment
  • Reagent Handling and Mixing
  • Product Loadout

Related Projects

800tpd Cobalt Concentrator and Hydromet Facility
Sulfide Gold/Copper Extraction
Gold Mine Tailings Handling Facility
Iron Ore Concentrator
Salt Mine Expansion Project
30,000tpd Tungsten-Molybdenum Concentrator NI 43-101
Copper Electrowinning Expansion
7,000tpd Gold Processing Plant
30,000tpd Gold Project
Existing Gold Mine Infrastructure Evaluation & Design
50tpd Concentrate Leach Circuit Addition
Debottlenecking Projects for a Major Gold Producer
error: Content is protected !!