Project Highlights
  • The project presented a unique challenge from the Utility with the requirement of less than 3% voltage drop during startup. SE provided a state-of-the-art solution with an integrated capacitor/reactor after numerous equipment manufactures said that it couldn’t be done.
  • Our automation team led the programming and commissioning efforts on site for this complex facility.
Services Provided
  • Detailed Engineering – process, mechanical, structural concrete/steel, piping design, electrical and instrumentation/automation.
  • Procurement
  • Project Management and Project Controls
  • Onsite Construction Support
Unit Operations
  • Inlet Custody Metering
  • Inlet Liquids Handling (slug catcher)
  • Inlet Compression
  • Mole Sieve Dehydration
  • GSP Cryo
  • Residue Compression
  • Fractionation Train
  • Product Pumping and Storage
  • Rail and Truck Loadout

Related Projects

24” Natural Gas Transmission Pipeline
100 MMscfd Gas Processing Plant
100,000 bopd EOR Separation and LACT Facility
600 MMscfd Cryogenic Gas Processing Plant
400 MMscfd Cryogenic Gas Processing Plant
400 MMscfd Cryogenic Gas Processing Plant
200 MMscfd Cryogenic Gas Processing Plant
142 MMscfd Refinery Off-Gas Treating Plant
120 MMscfd Gas Processing Facility
60 MMscfd Cryogenic Gas Processing Plant
15.7 BCF Natural Gas Storage Facility
40 MMscfd Natural Gas Compressor Station
Large Gas Utility Compressor Station Upgrades
40 MMscfd Compressor Station
100,000 bbl/d Produced Water Handling Facility
200 MMscfd Natural Gas Processing and Fractionation Plant
error: Content is protected !!