303-714-4840
303-714-4800

Gold Mine Tailings Handling Facility

Guatemala
Project Highlights
  • Tailings impoundment constraints required a filtration plant to be installed
  • Located in a high seismic area which required complex structural systems and design considerations
  • The remote site and small footprint available posed additional design challenges
  • Extensive infrastructure improvements (roads, power, benches, etc)
Services
  • Detailed Engineering – Process, piping/mechanical, civil/structural, electrical, instrumentation and controls/programming.
  • Procurement
  • Project Management and Project Controls
  • Onsite Construction Support
Unit Operations
  • Tailings Thickening
  • Plate and Frame Filtration
  • Material Handling
  • Tailings Stacking and Cement Mixing
  • Plant Water Treatment
  • Reagent Handling and Mixing

Related Projects

800tpd Cobalt Concentrator and Hydromet Facility
Sulfide Gold/Copper Extraction
Gold Mine Tailings Handling Facility
Iron Ore Concentrator
Salt Mine Expansion Project
30,000tpd Tungsten-Molybdenum Concentrator NI 43-101
Copper Electrowinning Expansion
7,000tpd Gold Processing Plant
30,000tpd Gold Project
Existing Gold Mine Infrastructure Evaluation & Design
50tpd Concentrate Leach Circuit Addition
Debottlenecking Projects for a Major Gold Producer
error: Content is protected !!