100,000 bopd EOR Separation and LACT Facility

Wyoming, USA
Project Highlights
  • Addition to existing CO2 flood field in which water and CO2 gas were separated from the oil so they could be reinjected
  • Primary separation via state-of-the-art heated three phase separators followed by gun barrel tanks
  • Three-stage oil skimming and polishing prior to sale
Services
  • Detailed Engineering – Process, piping/mechanical, civil/structural and electrical/instrumentation
  • Procurement
  • Project management and project control
  • Onsight Construction Management
Unit Operations
  • Heated free-water knockout vessels
  • Gun barrel and settling tanks
  • Vapor Recovery Unit
  • CO2 gas recompression for injection
  • Water injection pumps
  • Oil skimming and polishing tanks
  • Metering
  • BTEX elimination system

Related Projects

24” Natural Gas Transmission Pipeline
100 MMscfd Gas Processing Plant
100,000 bopd EOR Separation and LACT Facility
600 MMscfd Cryogenic Gas Processing Plant
400 MMscfd Cryogenic Gas Processing Plant
400 MMscfd Cryogenic Gas Processing Plant
200 MMscfd Cryogenic Gas Processing Plant
142 MMscfd Refinery Off-Gas Treating Plant
120 MMscfd Gas Processing Facility
60 MMscfd Cryogenic Gas Processing Plant
15.7 BCF Natural Gas Storage Facility
40 MMscfd Natural Gas Compressor Station
Large Gas Utility Compressor Station Upgrades
40 MMscfd Compressor Station
100,000 bbl/d Produced Water Handling Facility
200 MMscfd Natural Gas Processing and Fractionation Plant