303-714-4840
303-714-4800

600 MMscfd Cryogenic Gas Processing Plant

Colorado, USA
Project Highlights
  • Compact site required careful planning during Train 1 design to accommodate Train 2
  • Utilized the GSP + SCORE process to offer maximum flexibility in both propane and ethane recovery
  • Centrifugal compressors were an economic choice for residue gas due to plant size
Services
  • Detailed Engineering – process, piping/mechanical, civil/structural, electrical, instrumentation and controls/programming.
  • Procurement
  • Project Management and Project Controls
  • Onsite Construction Support
Unit Operations
  • Inlet Custody Metering
  • Inlet Liquids Handling (slug catcher)
  • Amine Treating
  • Mole Sieve Dehydration
  • GSP and SCORE
  • Residue Compression
  • Product Pumping and Storage

Related Projects

24” Natural Gas Transmission Pipeline
100 MMscfd Gas Processing Plant
100,000 bopd EOR Separation and LACT Facility
600 MMscfd Cryogenic Gas Processing Plant
400 MMscfd Cryogenic Gas Processing Plant
400 MMscfd Cryogenic Gas Processing Plant
200 MMscfd Cryogenic Gas Processing Plant
142 MMscfd Refinery Off-Gas Treating Plant
120 MMscfd Gas Processing Facility
60 MMscfd Cryogenic Gas Processing Plant
15.7 BCF Natural Gas Storage Facility
40 MMscfd Natural Gas Compressor Station
Large Gas Utility Compressor Station Upgrades
40 MMscfd Compressor Station
100,000 bbl/d Produced Water Handling Facility
200 MMscfd Natural Gas Processing and Fractionation Plant
error: Content is protected !!