30,000tpd Gold Project

Southern Armenia
Project Highlights
  • Detailed Engineering and NI 43-101 updates for a greenfield gold mine and processing facility
  • Heap leach and ADR for gold extraction
  • SE worked along side multiple equipment suppliers for value engineering and cost optimization
Services
  • Feasibility and Detailed Engineering – Process, piping/mechanical, civil/structural, electrical, instrumentation and controls
  • Metallurgical Testwork Program Support
  • Major Equipment Coordination
  • Project Management and Project Controls
  • Construction Support
Unit Operations
  • Crushing/Screening
  • Material Handling
  • Heap Leach
  • Carbon-In-Column (CIC)
  • Adsorption-Desorption-Recovery (ADR)
  • Tailings
  • Plant Water Treatment
  • Reagent Handling and Mixing
  • Product Loadout

Related Projects

800tpd Cobalt Concentrator and Hydromet Facility
Sulfide Gold/Copper Extraction
Gold Mine Tailings Handling Facility
Iron Ore Concentrator
Salt Mine Expansion Project
30,000tpd Tungsten-Molybdenum Concentrator NI 43-101
Copper Electrowinning Expansion
7,000tpd Gold Processing Plant
30,000tpd Gold Project
Existing Gold Mine Infrastructure Evaluation & Design
50tpd Concentrate Leach Circuit Addition
Debottlenecking Projects for a Major Gold Producer