Cherokee Natural Gas Supply

Ft. Lupton, Colorado

  • Project Overview
    • Odorization Station #2 - Connects 3 gas source lines into the 24" transmission pipeline
    • 33.6 miles of 24" diameter transmission pipeline with seven remotely actuated mainline valves
    • Power Plant Meter Station #3 - Meters the gas to be fed to the combined cycle turbines
    • F-916 Regulator Station - Controls the pressure to the intermediate pressure (IP) system to augment the Denver Metro IP System
    • Dual Orifice Meters - Meters the gas to be fed from the intermediate pressure (IP) system to the Power Plant in case of a shutdown of the 24" transmission pipeline from Ft. Lupton, CO
    • Cherokee Power Plant 16" Launcher
  • Major Deliverables
    • Muti-discipline engineering design
    • Construction Management
    • Procurement
    • Start-up and commissioning