Iron Ore Concentrator

USA

  • Project Overview 
    • Product - Iron Ore 
    • Throughput - 5,800 tpd
    • Approx. Total Installed Cost ~ $75M
    • Mining Method - Open Pit
  • Major Deliverables
    • Engineering for two million metric tonnes per annum Iron Concentrator Facility
    • Procurement, including international and domestic expediting (new and used equipment) 
    • Construction Management
    • Cost Controls
  •  Process Unit Operations
    • ROM Crushing/Stacking
    • Unit Load Out Systems
    • Primary Crushing
    • SAG Mill Closed Circuit Grinding
    • Hydro-Cyclone Classification
    • 3000 hp Regrind Ball Mill Iron Concentrate Slurry Conditioning
    • Double Drum WLIMS Cleaners