Gold Feasibility Study

Anatolia, Turkey

  • Project Overview 
    • Product - gold 
    • Through-put - 15,500 mtpd
    • Approximate Total Installed Cost - $140M
    • Mining Method - Open Pit
  •  Major Deliverables
    • Feasibility Study
    • Canadian National Instrument 43-101 Technical Report
  •  Process Unit Operations
    • 10,500 mtpd Heap Leach Circuit
    • 5,000 mtpd Milling Circuit
    • Autoclave for Extraction of Gold and Copper from Sulfide Ores
    • Counter Current Decantation (CCD) Circuit
    • Carbon-In-Pulp (CIP) Circuit
    • Thickening, Filtration, Solution Neutralization, Cyanide Destruction, Tailings Deposition