Copper PEA & Prefeasibility Study

Canada

  • Project Overview 
    • Product - Copper/Molybdenum
    • Through-put - 100,000 tpd
    • Approx. Total Installed Cost - $2.9B
    • Mining Method - Open Pit
  • Major Deliverables
    • PEA - Preliminary Economic Assessment
    • Pre-feasibility Study
    • Canadian National Instrument (NI) 43-101 Technical Reports
  • Process Unit Operations
    • Primary Crushing
    • Sag/Ball/Pebble Mill crushing comminution circuit
    • Bulk Flotation
    • Copper/Molybdenum Separation
    • Concentrate thickening
    • Filtering and drying
    • Tailings Storage Facility