Copper Feasibility & Basic Engineering

Peru

  • Project Overview 
    • Product - Copper
    • Through-put - 20,000 tpd
    • Approximate Total Installed Cost - $425M
    • Mining Method - Open Pit
  • Major Deliverables
    • Bankable Feasibility Study
    • NI 43-101 Report
    • Basic and FEED Engineering
    • Trade-off Studies
  •  Process Unit Operations
    • Primary and Secondary Crushing
    • High Pressure Grinding Roll (HPGR)/Ball Mill Grinding Circuit
    • Bulk Flotation
    • Copper and Molybdenum Separation
    • Concentrate Thickening and Drying