Samuel Engineering, Inc. Samuel Engineering, Inc. Samuel Engineering, Inc.
Samuel Engineering, Inc. Samuel Engineering, Inc.
Samuel Engineering, Inc. Samuel Engineering, Inc.
Newsletter Sign Up Image Latest News image
About Us
 > Capabilities
 > Certifications
 > NAICS Codes
 > Personnel Profiles
Company History
Services
Industries
Affiliates
Join Our Team
Contact Us
Home
 

About Us
Recent Projects

ANATOLIA MINERALS (ÇÖPLER GOLD) BANKABLE FEASILBILITY STUDY

SE recently performed a fast-paced feasibility study including a technical report per NI 43-101 for the Çöpler Gold Project for design of a plant throughput of about 5.6 million metric tons of oxide ore per year. Dry product material handling was designed for 15,500 metric tpd of ore through primary, secondary, and tertiary crushing circuits. A total of 5,000 metric tpd of crushed high-grade ore will be conveyed to the milling circuit and a total of 10,500 metric tpd of crushed, low-grade ore will be conveyed to the milling circuit or loaded onto the heap leach pad (HLP) with portable stacking conveyors.  Gold is recovered by Carbon-in-Leach (CIL) and Carbon-in-Column Processes.

NORTHERN PERU COPPER CORP., EL GALENO PROJECT, COPPER/MOLY SCOPING STUDY

SE is presently performing a pre-feasibility study for a 90,000 tpd copper concentrator located in northern Peru , following a successful scoping study. The plant site is located at 3,900 m.a.s.l. in an area where there is high sensitivity to mining development on the part of the local population in relation to environmental impact, employment and other sustainable development issues.

PALLADON IRON, IRON MOUNTAIN , UTAH

SE is performing detailed engineering design, procurement, and construction management (EPCM) services for a 7,000 tpd iron concentrator in Utah .

ALASKA MINING COMPANY, ROCK CREEK PROJECT

SE is performing detailed engineering design, procurement, and construction management (EPCM) services for the installation of a 7,000 tpd gold processing plant at Alaska Gold's Rock Creek Property located seven miles by road Northeast of Nome, Alaska. SE completed the feasibility study initiated by Roberts & Schaefer Company for Alaska Gold.

 

 


Image
 

Copyright 2004 Samuel Engineering, Inc.
 
Samuel Engineering, Inc.