Recent Projects
ANATOLIA
MINERALS (ÇÖPLER
GOLD) BANKABLE
FEASILBILITY STUDY
SE
recently performed a fast-paced feasibility study including a technical
report per NI 43-101 for the Çöpler Gold Project for
design of a plant throughput of about 5.6 million metric tons of
oxide ore per year. Dry product material handling was designed for
15,500 metric tpd of ore through primary, secondary, and tertiary
crushing circuits. A total of 5,000 metric tpd of crushed high-grade
ore will be conveyed to the milling circuit and a total of 10,500
metric tpd of crushed, low-grade ore will be conveyed to the milling
circuit or loaded onto the heap leach pad (HLP) with portable stacking
conveyors. Gold
is recovered by Carbon-in-Leach (CIL) and Carbon-in-Column Processes.
NORTHERN
PERU COPPER CORP., EL GALENO PROJECT, COPPER/MOLY SCOPING STUDY
SE
is presently performing a pre-feasibility study for a 90,000 tpd
copper concentrator located in northern Peru , following a successful
scoping study. The plant site is located at 3,900 m.a.s.l. in an
area where there is high sensitivity to mining development on the
part of the local population in relation to environmental impact,
employment and other sustainable development issues.
PALLADON
IRON, IRON MOUNTAIN , UTAH
SE
is performing detailed engineering design, procurement, and construction
management (EPCM) services for a 7,000 tpd iron concentrator in
Utah .
ALASKA
MINING COMPANY, ROCK CREEK PROJECT
SE is performing
detailed engineering design, procurement, and construction management
(EPCM) services for the installation of a 7,000 tpd gold processing
plant at Alaska Gold's Rock Creek Property located seven miles by
road Northeast of Nome, Alaska. SE completed the feasibility study
initiated by Roberts & Schaefer Company for Alaska Gold.
|
 |